CCTV Management and Control Panel
Client:
Not Available
Year:
2020
Company working in the CCTV sector from UAE needed a Control Panel that tracks output numbers from cameras against targets and alerts:
Needed graphs include:
1) Shift Target output vs.
- Actual output of last shift
- Average output of last X shifts (long term output average)
+ Standard Deviation of output (to visualize if the part is stable or rather unstable. Just a std. dev. number will not be so helpful though to grasp it to the less educated viewer of the data)
2) Quality metric
- on critical dimensions
- on auxiliary dimensions
Quality is measured by:
% of Bad calls vs. Calls Received(last shift vs. long term shift target vs. company target)
CPK which is a statistical measurement. Values less than 1 indicate a terrible stability,
Values between 1,0 - 1.33 are "yellow",
between 1.33-1.67 light green and above 1.67 phenomenal.
The value cannot exceed 10, but very very rarely goes above 3.0
One part maybe has 10 critical dimensions and 50 auxiliary dimensions. There is a CPK value for each dimension, but from a dashboard perspective it would be enough to look at averages in each category and maybe at the count of dimensions with values less than 1 and between 1.0 to 1.33